Karmen GTM brain
Karmen helps construction teams build and update project schedules from drawings, specifications and historical schedules.
category
AI construction schedulingmarket profile
- text: Construction schedules require ongoing revisions as project scope changes and delay impacts need explaining.
- text: Project managers also face substantial coordination overhead from subcontractor correspondence and construction systems.
personas
- title: Scheduling directorpains:
- Building bid schedules from large document sets takes scarce planner capacity.
- Maintaining consistent CPM logic and explaining revisions requires careful review.
- title: Construction project managerpains:
- Scope changes require schedule updates and defensible delay narratives.
- Project information is scattered across documents and communications.
- title: General superintendentpains:
- Missing details in drawings can produce unreliable sequencing and field surprises.
icp
- text: General contractors and specialty subcontractors responsible for planning complex construction work.
- text: Larger project teams processing extensive drawings and specifications and using Primavera P6 or Microsoft Project.
message pillars
- text: Apply AI to construction schedule preparation.
- text: Position the product as a scheduling co-pilot for project teams.
- text: Specialize in the construction industry.
objections
- objection: AI may miss scope or produce weak logic.response: Review generated schedules against source documents and existing project standards; the team retains decisions.
- objection: We cannot replace our scheduling system.response: Karmen says schedules export to Primavera P6 and Microsoft Project.
- objection: Project drawings are sensitive.response: Request security and data-use documentation during procurement.
competitors
- name: ALICE Technologieswhy: Construction scheduling and optimization overlap.
- name: nPlanwhy: AI construction schedule generation and risk analysis.
- name: Procorewhy: Construction management platform competes for project workflow.
keywords
- construction scheduling software
- AI construction scheduler
- Primavera P6 schedule automation
- construction baseline schedule
- construction time impact analysis
- CPM schedule generation
voice
- practical and construction-specific
- time-saving and direct
- human-in-control
signals
- text: Hiring schedulers or pursuing document-heavy construction bids suggests schedule production pressure.
- text: Frequent scope changes and time-impact analyses create a recurring update use case.
stack
- Primavera P6
- Microsoft Project
pricing
model: contact_sales
motion
sales_ledchannels
- YC directory
- demo requests
- construction software directories
confidence
mediumFounders
- name: Jonas Ebrahimititle: Founder/CEOrole: CEObio: My parents were general contractors, and during university, I gained experience working at JLL. After graduating, I joined IXM and was the youngest commodity trader in their history, primarily working with the European aluminum team. In this role, I managed the delivery of over $1 billion worth of refined aluminum annually, sourced from industrial projects around the globe.
- name: Naman Wahititle: Founder/CTOrole: CTObio: I hold a Master’s degree specialising in Artificial Intelligence and Machine Learning from Imperial College London. Previously, I was a software engineer at nPlan, a startup focused on delivering AI solutions for large-scale construction projects with clients such as Shell, ExxonMobil, and Skanska. Drawing on my experience in construction tech, I’m now building Karmen, an AI Assistant for Construction Project Managers.